TEPCO ponders the source of the Iodine-131 and concludes it is probably from reactor 3.  Apropos of our discussions earlier today and yesterday.

Full-text after the jump.

TEPCO Earthquake Information Update on March 25: Fukushima-Daiichi Status

(1)   Result of the investigation on exposure to radiation of workers
(2)   High radiation water may come from the unit 3 reactor, not spent fuel pool
(3)   Status of water injection to the pool.
(1) Result of the investigation on highly radiated workers

Bellow are the investigation results of their working environment. Radiation dose rate of surface of the water is approximately 400mSv/h.
Result of gamma-ray nuclide analyses based on sampling of puddle

We are assessing radiation dose of 2 worker’s leg skin by beta ray. This incident would be caused because the workers regarded radiation dose of working area as low from survey result of radiation dose on March 23, it was about 0.5 mSv/hr at 5:00 and no major water puddle there. Workers continued working without recognizing change of work environment although their APD were alarming during the work
TEPCO has thoroughly instructed its employees and contractor workers to pay attention to the alarm of their APD and evacuate when necessary.

Regarding this event, Fukushima Labor Bureau gave TEPCO verbal instructions. After summerising lessons learned and future measures to this event, TEPCO will report related government ministries and agencies to make sure radiation control thoroughly.

(2)High radiation water may come from the unit 3 reactor, not spent fuel pool

As for the leakage of radioactive materials at Unit 3 turbine building, we assume the water came from the reactor. We collected sample of the contaminated water in the turbine building of Unit 3 and conducted the gamma-emitting nuclide analysis. We confirmed the following nuclides with short half-life.

Nuclides        half-life (days)     density (bq/cubic centimeter)
Iodine 131        08.06                   1.2 x 10E6
Cesium 136        13.16                   2.3 x 10E4
Balium 140        12.75                   5.2 x 10E4

 

There are 148 fuel rods with less than one year of cooling period in the spent fuel pool at Unit 3. Those fuel rods were transferred to the spent fuel pool between Jun 23 and 28, 2010 having had more than 200 days of cooling period. Nuclides with short half-life had sufficient time for decay in the spent fuel pool, so it seems possible that the contaminated water in the turbine building is from the reactor.

We do not deny possibility that there might be certain damage to the reactor of Unit 3. Even should that be the case, as plant parameters such as the reactor pressure and D/W pressure is stable , we presume that RPV is not seriously damaged.

We are injecting seawater and from the night of March 25, fresh water into the reactor. The water turns into steam and comes out from the reactor vessel through the SRV, then depressurized at the suppression chamber and condensed to water. This flow of water is cooling the reactor. Having experienced fluctuations of temperature and pressure, the containment function might be loosened somewhere. In any event, the above is a possibility, not yet confirmed.

(3) Water injection into the pools and the reactors

Unit 1: Sea water injection into the reactor pressure vessel, from 3:37 pm on March 25th, we have started to inject fresh water into it.

Unit 2: From 10:30 am on March 25th, seawater injection through Fuel Pool Cooling and Filtering System (FPC) was started. This finished at 0:19 pm.

Unit 3 From 5:35 am on March 24th, seawater injection through Fuel Pool Cooling and Filtering System (FPC) was started and finished at 4:05 pm.

Spraying at the spent fuel pool by Kawasaki City Fire Department was carried out from 1:28 pm to 4:00 pm on March 25th.

Unit 4: From 2:35 pm on March 24th, spraying water by the concrete pumping vehicle was conducted and ended at approximately 5:30 pm on the same day.

From 6:05 am on March 25th, seawater injection through Fuel Pool Cooling and Filtering System (FPC) was started and finished at 10:20 am.